Guide How to plan an office fitout, step by step
Planning a fitout comes down to a handful of decisions: what each space has to do, which ranges to build it from, what it will cost, and when it can land. This is how to work through them here.
1. Start with the space
Browse by the room, not the product. Each workspace collection gathers what that space typically needs.
By room: Open-Plan & Workstations · Private Offices · Boardrooms & Meeting · Reception & Waiting · Breakout & Collaboration · Focus & Quiet Rooms
By sector: Education · Healthcare · Government
By business: Corporate & Head Office · Coworking Spaces · Call Centres · Hospitality · Startups & Small Offices
2. Choose one or two ranges
A floor reads as one scheme when it is specified from a small number of ranges that share frames, finishes and detailing.
- Workstations: JOIST and STANCHION
- Tables: LINTEL, STILE, TREAD and ROUNDEL
- Seating: KEEL and CHANCERY
- Soft seating: SETTLE and INGLE
- Storage: LEDGER, DRAY and VAULT
- Acoustic booths and settings: BOTHY
3. Specify from the product page
Each product page publishes dimensions, load ratings, materials, finish options, certifications and lead time.
Worktop finishes keep their board supplier's decor name, so the sample in your hand matches the name on your schedule. Most desks and tables are offered in:
- Standard: Studio White, New Oak Matte, New Oak Ravine, Nordic Maple
- Premium: Classic Oak, Sublime Teak, Natural Walnut
4. Price it
Every product carries its price, including each size and finish option. For a project, send us your schedule through Request a Quote. It helps to include:
- a floor plan, or headcount by area
- products and quantities, or the rooms you need furnished
- finish selections
- the site address and access notes, such as loading dock, lifts, stairs or after-hours delivery
- your required-by date
5. Plan around lead times
Lead time is stated on each product before you order. Most of the range is listed at 2 to 5 business days to major capital cities and some lines at 2 to 3 weeks. Indent ranges are made to order and take longer: BOTHY acoustic settings run to around 14 weeks. Put the longest lead item into the program first, and the rest of the schedule can be built around it.